Method
Six weeks
Five moves, one deployment
Every engagement runs as a deployment, not a project: a clear entry, a measurable exit, and code in production the whole way through.
- 01
Embed · Day 0 – 3
We arrive on site. Shadow the operators, read the spreadsheets nobody admits exist, and get access to the real data, not the demo.
- 02
Map · Week 1
Every workflow, handoff and failure point drawn as one system. We find the single bottleneck worth removing first.
- 03
Build · Weeks 2 – 6
Production code from week two. Daily deploys in front of the people who will use it. No slideware.
- 04
Ship · Week 6+
Live on your infrastructure: observable, tested, documented, and measured against the number agreed on day one.
- 05
Hand over · Ongoing
Your team owns it. Runbooks, training, full source. We stay on call until you stop needing us.